Component Inspection
■ HO2S Upstream (S1) Visual Inspection
- Ignition "OFF" and disconnect HO2S upstream (S1) connector.
- Inspect HO2S upstream (S1) for contamination or damage caused by foreign materials.
■ HO2S Upstream (S1) Performance Inspection
- Warm up the engine to normal operating temperature.
- Connect VMI to KDS/GDS and select "Oscilloscope".
- Connect Channel A positive probe to Pin No. 3 (Pumping Current) and Channel A negative probe to Pin No. 6 (Trim Resistor).
- Connect Channel B positive probe to Pin No. 2 (Nernst Voltage) and Channel B negative probe to Pin No. 1 (Virtual Ground).
A: Approx. 2000RPM
CH.1 - Pumping Current & Virtual Ground: - 0.5 ~ 0.4 V
CH.2 - Nernst Voltage & Trim Resistor: -1.0 ~ -0.0 V
B: Fuel Cut
CH.1 - Pumping Current & Virtual Ground: Approx. 0.89V
CH.2 - Nernst Voltage & Trim Resistor: Approx. 0.64V
■ Confirm Part Inspection
- Does the HO2S upstream (S1) operate properly? (Check variation)
YES
- Go to "Verification of Vehicle Repair " procedure.
NO
- Carefully re-do this troubleshooting guide steps.
- If problem still occurs, replace HO2S upstream (S1) and then go to "System Inspection" procedure.