Repair Procedures: Installation
WARNING: This page is about a different variant/trim than selected.
- The TDC marks of the intake and exhaust CVVT sprockets are slightly turned from the TDC position as shown when the timing chain is removed.
- Turn the crankshaft clockwise (about 1~2 pitches) from the TDC position (the dowel pin (A) of crankshaft is about 3° with the engine vertical line) as rotation of the intake CVVT sprocket from the TDC position.
- Install the timing chain guide (A).
Tightening torque :
18.6 ~ 22.6 N.m (1.9 ~ 2.3 kgf.m, 13.7 ~ 16.6 lb-ft)
- Install the timing chain tensioner arm (A).
Tightening torque :
18.6 ~ 22.6 N.m (1.9 ~ 2.3 kgf.m, 13.7 ~ 16.6 lb-ft)
- Install the timing chain.
Crankshaft sprocket (A) → Timing chain guide (B) → Intake CVVT sprocket (C) → Exhaust CVVT sprocket (D)
- Install the timing chain with no slack between the crankshaft sprocket and the intake CVVT sprocket.
NOTE: The timing marks of each sprocket should be matched with timing marks (color link) of timing chain when installing the timing chain.
- Install the timing chain on the exhaust CVVT sprocket with no slack while turning the CVVT assembly clockwise.
NOTE:
- The timing mark of the exhaust CVVT sprocket should be matched with timing mark (color link) of timing chain when installing the timing chain.
- Press down the timing chain links on the exhaust CVVT sprocket to prevent the sprocket from spinning.
- Install the timing chain with no slack between the crankshaft sprocket and the intake CVVT sprocket.
- Install the timing chain auto tensioner (A) and remove the stopper pin (B).
Tightening torque :
9.8 ~ 11.8 N.m (1.0 ~ 1.2 kgf.m, 7.2 ~ 8.7 lb-ft)
Courtesy of KIA MOTORS AMERICA, INC.
NOTE:- When reinstall the tensioner, always use new tensioner.
- After rotating crankshaft 2 revolutions in regular direction (clockwise viewed from front), confirm that the TDC marks on the intake and exhaust CVVT sprockets are aligned with the top surface of cylinder head.
- Install the other parts reverse order of removal.NOTE:
- Refill engine with engine oil.
- Clean battery posts and cable terminals and assemble.
- Inspect for fuel leakage.
- After assembling the fuel line, turn on the ignition switch (do not operate the starter) so that the fuel pump runs for approximately two seconds and fuel line pressurizes.
- Repeat this operation two or three times, then check for fuel leakage at any point in the fuel line.