Repair Procedures: Installation
- Connect the AVN monitor connectors.
- Install the AVN monitor.
- Install the center fascia upper panel.
- Connect the negative (-) battery terminal.NOTE:
- Make sure that the cables and connectors are plugged in properly.
- Check the AVN system.