Repair Procedures: Installation
- Install the console floor switch complete.
- Install the connector from the console floor switch complete.
- Connect the connectors from the console upper complete.
- Install the console upper complete.
- Connect the negative (-) battery terminal.
NOTE:
- Make sure that the connectors are plugged in properly.
- Check the AVM system for normal operation.