Signal Circuit Inspection
- Ignition "OFF".
- Disconnect Battery (-) terminal.
- Refer to ENGINE CONTROL MODULE (ECM) "service information" and disconnect ECM/PCM connector.
- Measure resistance between Pin No. 6 (V_IP) terminal of Upstream O2 Sensor connector and Pin No. 83 (V_IP) terminal of ECM/PCM harness connector.
- Measure resistance between Pin No. 1 (V_N) terminal of Upstream O2 Sensor connector and Pin No. 105 (V_N) terminal of ECM/PCM harness connector.
- Measure resistance between Pin No. 3 (V_G) terminal of Upstream O2 Sensor connector and Pin No. 84 (V_G) terminal of ECM/PCM harness connector.
- Measure resistance between Pin No. 4 (V_RC) terminal of Upstream O2 Sensor connector and Pin No. 104 (V_RC) terminal of ECM/PCM harness connector.
Specification: Approx. below 1Ω
- Is the measured value within specification?
YES
- Go to "COMPONENT INSPECTION " procedure.
NO
- Repair open or short in signal circuit between Upstream O2 Sensor and ECM/PCM and then go to "VERIFICATION OF REPAIR " procedure.