HO2S Upstream (S1) Performance Inspection
- Warm up the engine to normal operating temperature.
- Connect VMI to KDS/GDS and select "Oscilloscope".
- Connect Channel A positive probe to Pin No. 3 (Pumping Current) and Channel A negative probe to Pin No. 6 (Trim Resistor).
- Connect Channel B positive probe to Pin No. 2 (Nernst Voltage) and Channel B negative probe to Pin No. 1 (Virtual Ground).
A: Approx. 2000RPM
CH.1 - Pumping Current & Virtual Ground: - 0.5 ~ 0.4 V
CH.2 - Nernst Voltage & Trim Resistor: -1.0 ~ -0.0 V
B: Fuel Cut
CH.1 - Pumping Current & Virtual Ground: Approx. 0.89V
CH.2 - Nernst Voltage & Trim Resistor: Approx. 0.64V