Repair Procedures: Installation
- Install the shift cable retainer (A).
Tightening torque:
7.8 - 11.8 N.m (0.8 - 1.2 kgf.m, 5.8 - 8.7 lb.ft)
- Insert the snap pin after installing the shift cable (A).NOTE:
- Install the shift cable after checking the direction of projection to prevent incorrect assembly.
- Mind the installation direction of snap pin and install the snap pin with the hook facing downward.
- Install the floor console assembly.
(Refer to Body - "FLOOR CONSOLE ASSEMBLY ")
- Install the knob (A) by pressing it in the direction of arrow after installing the boots to the console upper cover.
- Check that the shift lever and manual control lever are placed in the "N" position.
- Install the shift cable (B) to bracket (C) and then lightly tighten the nut (A).NOTE: The existing shift cable clip (A) must be replaced with new one. (Do not reuse it.)
- Tighten the nut (A) to the specified torque after removing free play by pushing the shift cable in the direction of the arrow.
Tightening torque:
7.8 - 11.8 N.m (0.8 - 1.2 kgf.m, 5.8 - 8.7 lb.ft)
- Install the battery and battery tray.
(Refer to Engine Electrical System - "BATTERY ")
- Install the air cleaner assembly and air duct.
(Refer to Engine Mechanical System - "AIR CLEANER ")