Inspect Power Main Relay Continuity
POWER MAIN RELAY CONTINUITY
| Condition |
Tester connection |
Specified condition |
| Constant |
1 - 2 |
Continuity |
| Apply B+ between terminals 1 and 2. |
3 - 5 |
Continuity |
If continuity is not as specified, replace the relay.