Fuel Injector: Installation
- INSTALL FUEL INJECTOR ASSEMBLY
- Install a new O-ring, grommet and insulator to the injector.
- Push and rotate the injector 45° clockwise and counterclockwise to install it to the delivery pipe.
- Check that the injector rotates smoothly.NOTE: When the injector does not rotate smoothly, the O-ring may be pinched. Remove the injector and install a new O-ring to the injector.
- INSTALL NO. 2 FUEL DELIVERY PIPE SUB-ASSEMBLY
- Install the delivery pipe (with injector) to the intake manifold.
- With the condition as stated above, rotate the injector 45° clockwise and counterclockwise.
- With the spacer contacting the delivery pipe, install the delivery pipe with the 2 nuts.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY
- Install the delivery pipe (with injector) to the intake manifold.
- With the condition as stated above, rotate the injector 45° clockwise and counterclockwise.
- With the spacer contacting the delivery pipe, install the delivery pipe with the 2 nuts.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- INSTALL FUEL PRESSURE PULSATION DAMPER ASSEMBLY (See INSTALLATION )
- INSTALL ENGINE WIRE
- Install the 2 wire clamps to the wire clamp bracket on the RH delivery pipe.
- INSTALL PURGE VSV (See INSTALLATION )
- INSTALL NO. 4 V-BANK COVER BRACKET
- Install the bracket with the 2 nuts.
Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf)
- Install the bracket with the 2 nuts.
- INSTALL NO. 3 V-BANK COVER BRACKET
- Install the bracket with the bolt.
Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf)
- Install the bracket with the bolt.
- INSTALL NO. 2 V-BANK COVER BRACKET
- Install the bracket with the nut.
Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf)
- Install the bracket with the nut.
- INSTALL NO. 1 V-BANK COVER BRACKET
- Install the bracket with the bolt.
Torque: 7.5 N*m (76 kgf*cm, 66 in.*lbf)
- Install the bracket with the bolt.
- INSTALL INTAKE AIR CONNECTOR PIPE
- Install the intake air connector pipe with the bolt and hose clamp.
Torque:
4.0 N*m (41 kgf*cm, 35 in.*lbf) for hose clamp
5.0 N*m (51 kgf*cm, 44 in.*lbf) for bolt
- Connect the air hose and No. 1 ventilation hose together.
- Install the intake air connector pipe with the bolt and hose clamp.
- INSTALL NO. 1 AIR CLEANER INLET
- Install the air cleaner inlet with the bolt.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
- Install the air cleaner inlet with the bolt.
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- PERFORM INITIALIZATION
- Perform initialization (see
INITIALIZATION
).NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- Perform initialization (see
INITIALIZATION
).
- CHECK FOR FUEL LEAKS (See ON-VEHICLE INSPECTION )
- ADD COOLANT (See REPLACEMENT )
- CHECK FOR COOLANT LEAKS (See ON-VEHICLE INSPECTION )
- INSTALL V-BANK COVER
- Install the cover with the nuts.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
- Install the cover with the nuts.