Inspection Procedure
NOTE:
When replacing the skid control ECU, perform the following operations:
- Initialization of linear solenoid valve and calibration. Refer to INITIALIZATION
- Yaw rate and acceleration sensor zero point calibration. Refer to CALIBRATION
HINT:
Start the inspection from "CHECK HARNESS AND CONNECTOR" when using the Techstream and start from "PERFORM TEST MODE" when not using the Techstream.