LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Lexus >> 2012 >> IS 350 Base, RWD >> Repair and Diagnosis (Single Page) >> Steering >> Steering Column >> Steering Lock System (Diagnostic Codes & Circuit Tests) >> Steering Lock System >> Circuit Tests >> Power Source Circuit >> Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Power Source Circuit: Procedure

  1. CHECK HARNESS AND CONNECTOR (STEERING LOCK ACTUATOR ASSEMBLY - BODY GROUND) 
    1. Disconnect the J29 connector from the steering lock actuator assembly.
      Fig 1: Identifying Steering Lock Actuator Assembly J29 Connector
      GTY114100Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Measure the resistance according to the value(s) in the table below.

      Standard resistance

      Tester connection
      (Symbols)
      Condition Specified condition
      J29-1 (GND) - Body ground Always Below 1 Ω
      J29-2 (SGND) - Body ground Always Below 1 Ω

    NG → REPAIR OR REPLACE HARNESS OR CONNECTOR 

    OK: Go to next step 

  2. CHECK HARNESS AND CONNECTOR (STEERING LOCK ACTUATOR ASSEMBLY - BATTERY) 
    1. Measure the voltage according to the value(s) in the table below.
      Fig 2: Checking Harness & Connector (Steering Lock Actuator Assembly -- Battery)
      GTY114102Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Standard voltage

      Tester connection
      (Symbols)
      Condition Specified condition
      J29-7 (B) - J29-1 (GND) Always 10 to 14 V
      J29-7 (B) - J29-2 (SGND) Always 10 to 14 V

    OK → PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE 

    NG → REPAIR OR REPLACE HARNESS OR CONNECTOR (STEERING LOCK ACTUATOR ASSEMBLY - BATTERY)