LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Lexus >> 2015 >> CT 200h Base >> Repair and Diagnosis >> Accessories & Equipment >> Infotainment >> Navigation System - Service Information >> Navigation Receiver >> Installation [08/2014 - ] >> Procedure
September 30: LEMON manuals is back up on a temporary server! Slowness is possible

Installation [08/2014 - ]: Procedure

  1. INSTALL RADIO RECEIVER ASSEMBLY 
  2. INSTALL NO. 2 RADIO BRACKET 
    1. Install the No. 2 radio bracket with the 4 screws.
  3. INSTALL NO. 1 RADIO BRACKET 
    1. Install the No. 1 radio bracket with the 4 screws.
  4. INSTALL DCM (TELEMATICS TRANSCEIVER) WITH BRACKET (w/ Manual (SOS) Switch) 

    Refer to PROCEDURE - Step 3

  5. INSTALL RADIO RECEIVER ASSEMBLY WITH BRACKET 
    1. Connect each connector.
    2. Install the radio receiver assembly with bracket with the 4 bolts.
  6. INSTALL AIR CONDITIONING CONTROL ASSEMBLY 

    Refer to PROCEDURE - Step 3

  7. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY 

    Refer to PROCEDURE - Step 17

  8. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 22

  9. INSTALL UPPER NO. 1 CONSOLE PANEL GARNISH 

    Refer to PROCEDURE - Step 23

  10. INSTALL UPPER NO. 2 CONSOLE PANEL GARNISH 

    Refer to PROCEDURE - Step 24

  11. INSTALL LOWER CENTER INSTRUMENT PANEL FINISH PANEL 

    Refer to PROCEDURE - Step 7

  12. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 18

  13. INSTALL NO. 3 INSTRUMENT CLUSTER FINISH PANEL GARNISH (for Metal Finish Panel and Urethane Panel) 

    Refer to PROCEDURE - Step 21

  14. INSTALL NO. 3 INSTRUMENT CLUSTER FINISH PANEL GARNISH (for Wood Panel and Bamboo Panel) 

    Refer to PROCEDURE - Step 22

  15. INSTALL INSTRUMENT SIDE PANEL RH 

    Refer to PROCEDURE - Step 29

  16. INSTALL FRONT DOOR OPENING TRIM WEATHERSTRIP RH 

    Refer to PROCEDURE - Step 51

  17. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL 
    NOTE:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See article. Refer to INITIALIZATION [08/2014 - 08/2015] Refer to INITIALIZATION [08/2015 - ] ).

  18. INSTALL REAR FLOOR BOARD UPPER NO. 3 PLATE 

    Refer to PROCEDURE - Step 69

  19. INSTALL DECK FLOOR BOX RH 

    Refer to PROCEDURE - Step 70

  20. INSTALL REAR NO. 3 FLOOR BOARD 

    Refer to PROCEDURE - Step 71

  21. INSTALL REAR DECK FLOOR BOX 

    Refer to PROCEDURE - Step 72

  22. INSTALL REAR NO. 2 FLOOR BOARD 

    Refer to PROCEDURE - Step 73

  23. REPLACED OPERATION (w/ Parking Assist Monitor System) 

    (See article. Refer to INITIALIZATION [08/2014 - 08/2015] Refer to INITIALIZATION [08/2015 - ] )