September 30: LEMON manuals is back up on a temporary server! Slowness is possible
Installation [07/2015 - ]: Procedure
- INSTALL NO. 1 INTEGRATION RELAY
- Connect the 4 connectors.
- Install the No. 1 integration relay to the engine room relay block and junction block assembly.
- Connect the connector.
- INSTALL NO. 1 RELAY BLOCK COVER