Open in Bus 5 Main Bus Line [10/2015 - ]: Procedure
- CHECK FOR OPEN IN CAN BUS LINES (NETWORK GATEWAY ECU)
- Disconnect the cable from the negative (-) auxiliary battery terminal.
- Disconnect the J75 network gateway ECU connector.
- Measure the resistance according to the value(s) in the table below.
*a Front view of wire harness connector
(to Network Gateway ECU)Standard Resistance
Tester Connection Condition Specified Condition J75-15 (CA5H) - J75-16 (CA5L) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω Result
Result OK NG
Result:
OK
REPLACE NETWORK GATEWAY ECU. Refer to REMOVAL [10/2015 - 08/2016] , or refer to REMOVAL [08/2016 - 08/2019] , or refer to REMOVAL [08/2019 - ]
Result:
NG
See step 2
- CHECK FOR OPEN IN CAN BUS LINES (COMBINATION METER ASSEMBLY)
- Reconnect the J75 network gateway ECU connector.
- Disconnect the J10 combination meter assembly connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition J10-29 (CANH) - J10-30 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω *a Front view of wire harness connector
(to Combination Meter Assembly)Result
Result OK NG
Result:
OK
REPLACE COMBINATION METER ASSEMBLY. Refer to REMOVAL [10/2015 - 08/2016] , or refer to REMOVAL [08/2016 - 03/2018] , or refer to REMOVAL [03/2018 - 08/2019] , or refer to REMOVAL [08/2019 - ]
Result:
NG
See step 3
- CHECK FOR OPEN IN CAN BUS LINES (NO. 5 CAN JUNCTION CONNECTOR)
- Reconnect the J10 combination meter assembly connector.
- Disconnect the J97 No. 5 CAN junction connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition Connected to J97-1 (CANH) - J97-12 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω Network gateway ECU J97-6 (CANH) - J97-17 (CANL) Cable disconnected from negative (-) auxiliary battery terminal 108 to 132 Ω Combination meter assembly *a Front view of wire harness connector
(to No. 5 CAN Junction Connector)*b to Network Gateway ECU *c to Combination Meter Assembly Result
Result Proceed to OK A NG (Network gateway ECU main lines) B NG (Combination meter assembly main lines) C
Result:
A
REPLACE NO. 5 CAN JUNCTION CONNECTOR
Result:
B
REPAIR OR REPLACE CAN MAIN BUS LINES OR CONNECTOR (NETWORK GATEWAY ECU - NO. 5 CAN JUNCTION CONNECTOR)
Result:
C
REPAIR OR REPLACE CAN MAIN BUS LINES OR CONNECTOR (COMBINATION METER ASSEMBLY - NO. 5 CAN JUNCTION CONNECTOR)