LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Lexus >> 2019 >> LC 500 >> Repair and Diagnosis >> External Pages >> Different car >> Section 14 (Brake Control System - Service Information) >> Yaw Rate And Acceleration Sensor >> Installation [04/2013 - ] >> Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation [04/2013 - ]: Procedure

WARNING: This page does not describe the selected car, but rather 27 other vehicles, including the 2024 Lexus IS 500, 2024 Lexus IS 350, 2024 Lexus IS 300, 2023 Lexus IS 500, and 2023 Lexus IS 350. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL YAW RATE SENSOR BRACKET 
    1. Engage the 2 claws and install the yaw rate sensor bracket.
      GTY461676Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      HINT: 

      Install the yaw rate sensor bracket while avoiding the wire harness.

    2. Install the 3 bolts.

      Torque: 8.5 N.m (87 kgf/cm, 75 in.lbf) 

    3. Engage the wire harness clamp (A) to the yaw rate sensor bracket.
    4. w/ Navigation System:
      1. Engage the wire harness clamp (B) to the yaw rate sensor bracket.
  2. INSTALL YAW RATE SENSOR 
    1. Install the yaw rate sensor with the 2 nuts.

      Torque: 9.0 N.m (92 kgf/cm, 80 in.lbf) 

      NOTE:
      • Do not drop the yaw rate sensor.
      • If the yaw rate sensor is dropped, replace it with a new one.
    2. Connect the connector to the yaw rate sensor.
      NOTE:

      Make sure that the yaw rate sensor connector is connected securely.

    3. Engage the wire harness clamp to the yaw rate sensor bracket.
  3. INSTALL NO. 1 CONSOLE BOX DUCT 

    Refer to PROCEDURE - Step 7 [04/2013 - 08/2015] , or refer to PROCEDURE - Step 7 [08/2015 - 10/2016] , or refer to PROCEDURE - Step 7 [10/2016 - 10/2017] , or refer to PROCEDURE - Step 7 [10/2017 - 09/2020] , or refer to PROCEDURE - Step 7 [09/2020 - 11/2021] , or refer to PROCEDURE - Step 7 [11/2021 - 09/2022] , or refer to PROCEDURE - Step 7 [09/2022 - ]

  4. INSTALL CONSOLE BOX ASSEMBLY 

    Refer to INSTALLATION [04/2013 - 10/2016] , or refer to INSTALLATION [10/2016 - 09/2020] , or refer to INSTALLATION [09/2020 - 11/2021] , or refer to INSTALLATION [11/2021 - ]

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
    NOTE:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Refer to INITIALIZATION [04/2013 - 06/2014] , or refer to INITIALIZATION [06/2014 - 08/2015] , or refer to INITIALIZATION [08/2015 - 10/2016] , or refer to INITIALIZATION [10/2016 - 10/2017] , or refer to INITIALIZATION [10/2017 - 09/2020] , or refer to INITIALIZATION [09/2020 - 11/2021] , or refer to INITIALIZATION [11/2021 - 09/2022] , or refer to INITIALIZATION [09/2022 - 10/2023] , or refer to INITIALIZATION [10/2023 - ]

  6. PERFORM YAW RATE AND ACCELERATION SENSOR ZERO POINT CALIBRATION AND STORE SYSTEM INFORMATION 

    Refer to CALIBRATION [04/2013 - 10/2016] , or refer to CALIBRATION [10/2016 - 09/2020] , or refer to CALIBRATION [09/2020 - ]