October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Pull-In Test
1.Disconnect terminal M wire, then connect B+ and ground starter body. 2Ensure pinion ejects. Do not apply voltage for more than 10 seconds; starter damage may result. 3.If results are not as specified, replace magnetic switch.