LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mazda >> 1996 >> 626 L4-1991cc 2.0L DOHC >> Repair and Diagnosis >> Relays and Modules >> Relays and Modules - Powertrain Management >> Relays and Modules - Ignition System >> Ignition Control Module >> Testing and Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Ignition Control Module: Testing and Inspection

IGNITION CONTROL MODULE INSPECTION (w/MTX)
1. Measure the voltage of the Electronic Control Module (ECM) terminal as follows.
- 2F (Ignition control module)

ECM Pinout Part 1 Of 4:





ECM Pinout Part 2 Of 4:





ECM Pinout Part 3 Of 4:





ECM Pinout Part 4 Of 4:





2. Check the condition of the connector, distributor, ignition coil, and high-tension leads.
3. If all are normal but misfire still occurs, replace the distributor.