LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mazda >> 2005 >> 6 L4-2.3L >> Repair and Diagnosis >> Powertrain Management >> Computers and Control Systems >> Testing and Inspection >> Oscilloscope Patterns and Waveforms >> California Emission Regulation Applicable ATX Model
October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.

California Emission Regulation Applicable ATX Model

Inspection Using An Oscilloscope (Reference) (California emission regulation applicable ATX model)




CKP sensor signal
- PCM terminals: 27(+) - 1(-)
- Oscilloscope setting: 1 V/DIV (Y), 10 ms/DIV (X), DC range
- Vehicle condition: Idle after warm up (no load)




CMP sensor signal
- PCM terminals: 28(+) - 2(-)
- Oscilloscope setting: 500 mV/DIV (Y), 20 ms/DIV (X), DC range
- Vehicle condition: Idle after warm up (no load)




Generator field coil control signal
- PCM terminals: 36(+) - 26(-)
- Oscilloscope setting: 250 mV/DIV (Y), 1 ms/DIV (X), DC range
- Vehicle condition: Idle after warm up (no load)




HO2S (rear) signal
- PCM terminals: 44(+) - 26(-)
- Oscilloscope setting: 200 mV/DIV (Y), 1 ms/DIV (X), DC range
- Vehicle condition: Idle after warm up (no load)




HO2S (middle) signal
- PCM terminals: 45(+) - 26(-)
- Oscilloscope setting: 200 mV/DIV (Y), 1 ms/DIV (X), DC range
- Vehicle condition: Idle after warm up (no load)




Generator Output Voltage signal
- PCM terminals: 63(+) - 26(-)
- Oscilloscope setting: 2.5 V/DIV (Y), 5 ms/DIV (X), DC range
- Vehicle condition: Idle after-warm up (no load)




VSS out signal
- PCM terminals: 70(+) - 26(-)
- Oscilloscope setting: 500 mV/DIV (Y), 10 ms/DIV (X), DC range
- Vehicle condition: Idle after warm up (no load)




Fuel injection signal
- PCM terminals
- No.1:76(+) - 26(-)
- No.2: 50(+) - 26(-)
- No.3: 75(+) - 26(-)
- No.4: 49(+) - 26(-)

- Oscilloscope setting: 2.5 V/DIV (Y), 10 ms/DIV (X), DC range
- Vehicle condition: Idle after warm up (no load)




HO2S (front) heater control signal
- PCM terminals: 84(+)-26(-)
- Oscilloscope setting: 2.5 V/DIV (Y), 50 ms/DIV (X), DC range
- Vehicle condition: Idle after warm up (no load)




Purge control signal
- PCM terminals: 85(+) - 26(-)
- Oscilloscope setting: 2 V/DIV (Y), 10 ms/DIV (X), DC range
- Vehicle condition: Idle after warm up (engine speed approx. 700 rpm, no load, P/S off, A/C off)




OCV control signal
- PCM terminals: 97(+) - 26(-)
- Oscilloscope setting: 2 V/DIV (Y), 0.8 ms/DIV (X), DC range
- Vehicle condition: Idle after warm up (engine speed approx. 700 rpm, no load, P/S off, A/C off)




Ignition coil signal
- PCM terminals
- No.1 cylinder: 102 (+) - 26 (-)
- No.2 cylinder: 78 (+) - 26 (-)
- No.3 cylinder: 103 (+) - 26 (-)
- No.4 cylinder: 104 (+) - 26 (-)

- Oscilloscope setting: 2.5V/DIV (Y), 20 ms/DIV (X), DC range
- Vehicle condition: Idle after warm up (no load)