LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mazda >> 2007 >> RX8 2RTR-1.3L >> Repair and Diagnosis >> Powertrain Management >> Relays and Modules - Powertrain Management >> Relays and Modules - Computers and Control Systems >> Main Relay (Computer/Fuel System) >> Testing and Inspection >> Component Tests and General Diagnostics >> Main Relay Operation Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Main Relay Operation Inspection

Main Relay Operation Inspection
1. Verify that the main relay clicks when the ignition switch is turned to the ON position and off.
- If there is no operation sound, inspect the following:
- Main relay (See RELAY INSPECTION.) Relay Inspection
- Wiring harness and connector between battery and main relay terminal A.
- Wiring harness and connector between PCM terminal 5AC, 5AF and main relay terminal C.
- Wiring harness and connector between PCM terminal 4E and main relay terminal E.
- Wiring harness and connector between PCM terminal 4Q and engine fuse.