Deployment Procedure for Outside of Vehicle: Notes
- Inspect the SST (Deployment tool). (See INSPECTION OF SST (DEPLOYMENT TOOL) [STANDARD DEPLOYMENT CONTROL SYSTEM] .)
- Switch the ignition off.
- Disconnect the negative battery cable and wait for 1 min or more. (See NEGATIVE BATTERY CABLE DISCONNECTION/CONNECTION .)
- Follow the procedure below for operating (deploying) the applicable air bag module or pretensioner seat belt.
NOTE:
- The connector part of the air bag module and the SST (adapter wiring harness) burns out from the high heat when the inflator is operated (deployed).