LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mini >> 2012 >> Cooper Base, 2D Convertible, Automatic Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 3597 (General Electrical System - Repair) >> Plug Connection, Terminal, Fuse Box >> 61 13... Opening contacts and locks of different plug contact systems >> 61 13... Inline plugs, 4-, 10- pin, System Elo
April 5, 2026: LEMON Manuals is launched! Read the announcement.

61 13... Inline plugs, 4-, 10- pin, System Elo

WARNING: This page is about a different car, the 2011 BMW 750xi, 2011 BMW 750Lxi, 2010 BMW 750xi, and 2010 BMW 750Lxi. However, it is still accessible from the selected car via links, so may be relevant.

Detach fastener (1) from contact carrier (2).

Fig 1: Detaching Fastener From Contact Carrier
G08509679Courtesy of BMW OF NORTH AMERICA, INC.

Hold down retaining hook (3) of defective contact and pull cable and contact up to secondary lock (6).

Fig 2: Holding Down Retaining Hook Of Defective Contact
G08509680Courtesy of BMW OF NORTH AMERICA, INC.

Hold down retaining hook once again in secondary lock and pull cable and contact completely out of contact carrier.

Fig 3: Pulling Cable And Contact Completely Out Of Contact Carrier
G08509681Courtesy of BMW OF NORTH AMERICA, INC.