LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mini >> 2020 >> Cooper Base, 2D Convertible, Automatic DCT Trans >> Repair and Diagnosis (Single Page) >> Accessories & Equipment >> Drivers Assistance Systems - ADAS >> General Electrical System - Repair (F57 ADAS) >> 61 14 Power Distribution Power Connection Points >> 61 14... Replace front power distribution box
April 5, 2026: LEMON Manuals is launched! Read the announcement.

61 14... Replace front power distribution box

Special tools required: 

WARNING: Observe SAFETY INSTRUCTIONS  for handling vehicle battery.

Preliminary work needed: 

Removal: 

NOTE: Use this operation for all existing SV fuse modules (1).

Release detents and remove SV fuse module (1) from power distribution box (2).

G11147897Courtesy of BMW OF NORTH AMERICA, INC.

Take notes, and photographs where necessary, of fuse layout and relay assignment.

Remove all fuses and relays from power distribution box (1).

G11147898Courtesy of BMW OF NORTH AMERICA, INC.

Release cover of positive supply (1) at detents and remove from power distribution box (2).

G11147899Courtesy of BMW OF NORTH AMERICA, INC.

Release and remove positive battery cable (1) at nut.

Enter cable assignment according to pin no. (see rear of power distribution box) in table (see last operation) and take a photograph if necessary.

Attention! In the case of several different cable colors these cables must be marked again.

G11147900Courtesy of BMW OF NORTH AMERICA, INC.

Open all locking pins at power distribution box and at new part.

Detail (A) shows closed locking pin, detail (B) shows open locking pin.

Unspin all cables on the power distribution box using special tools 61 0 316  , 61 0 317  , 61 0 325  .

G11147901Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Pin cable according to the noted pin no. in power distribution box.

Close locking pins at power distribution box.

Detail (A) shows closed locking pin, detail (B) shows open locking pin.

G11147901Courtesy of BMW OF NORTH AMERICA, INC.

Turn power distribution box over.

Tighten positive battery cable (1) at nut.

Tightening torque 61 14 2AZ.

G11147900Courtesy of BMW OF NORTH AMERICA, INC.

Fit cover of positive supply (1) at power distribution box (2).

NOTE: Make sure cover of positive supply (1) is correctly seated and locked into place.
G11147899Courtesy of BMW OF NORTH AMERICA, INC.

Join all fuses and relays according to the noted assignment diagram in power distribution box (1).

G11147898Courtesy of BMW OF NORTH AMERICA, INC.
NOTE: Use this operation for all existing SV fuse modules (1).

Join SV fuse module (1) in power distribution box (2).

NOTE: Ensure correct locking.
G11147897Courtesy of BMW OF NORTH AMERICA, INC.
PIN AND CABLE COLOR DESCRIPTION

Pin no. Cable color Pin no. Cable color Pin no. Cable color
1   25   202  
2   26   203  
3   27   204  
4   28   205  
5   29   206  
6   30   207  
7   31   208  
8   32   209  
9   33   210  
10   34   211  
11   35   217  
12   36      
13   37      
14   38      
15   39      
16   40      
17   41      
18   42      
19   43      
20   44      
21   45      
22   46      
23   47      
24   48