LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mitsubishi >> 2012 >> Galant FE >> Repair and Diagnosis >> General Information >> OBD-II Drive Cycles >> Drive Cycle Procedures >> 2001 Montero >> Pattern 12 >> Test Procedure
October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.

Test Procedure

  1. Start the engine with all the accessories switched OFF.
  2. Drive the vehicle for 3 minutes at the following conditions. (During the monitor)
    • Vehicle speed: More than 15 km/h (9.4 mph)
    • Engine speed: More than 1,600 r/min, less than 4,000 r/min
    • Engine load: More than 25%, less than 50%
  3. Stop the safe place and let the engine idle for 20 seconds.
  4. Accelerate until the vehicle speed is more than 50 km/h (31 mph).
    • Engine speed: More than 2,500 r/min
    • Engine load: More than 55%
  5. Stop at safe place and let the engine idle for 20 seconds. (During the monitor)

Repeat Steps 4 and 5 for 10 times. Stop the vehicle at the safe place and turn the ignition switch to "LOCK" (OFF) position. Start the engine and do Steps 1 to 7 again. Confirm that the diagnostic trouble code (DTC) is not output.