Pull-In Windings Test
Connect test equipment as in hold-in windings test. See HOLD-IN WINDINGS TEST. See Figure. Ground starter solenoid terminal "M". Turn switch on and quickly adjust carbon pile load until voltage reads as specified. See the PULL-IN WINDINGS SPECIFICATIONS table. Check ammeter reading. Turn off carbon pile and open switch. Refer to the PULL-IN WINDINGS SPECIFICATIONS table. If ammeter reading is not as specified, replace starter solenoid.
HOLD-IN WINDINGS SPECIFICATIONS
| Engine & Starter Motor |
Amps |
| 2.4L |
| SD255 |
10-20 |
| PG260MQ |
* |
| 3.1L |
| SD205 |
10-20 |
| PG260MQ |
* |
PULL-IN WINDINGS SPECIFICATIONS
| Engine |
Starter Motor |
Amps |
| 2.4L |
| PG260MQ |
* |
| SD255 |
60-85 |
| 3.1L |
| PG260 F1 |
* |
| SD205 |
60-85 |
Courtesy of GENERAL MOTORS CORP.