Installation Procedure
- Position a NEW throttle body gasket to the upper intake manifold.
- Position the throttle body to the upper intake manifold.
- Install the throttle body bolts and tighten to 10 N.m (89 lb in).
- Connect the engine wiring harness electrical connector (2) to the ETC.
- Install the air cleaner outlet duct. Refer to Air Cleaner Outlet Duct Replacement .
- Perform the Throttle Learn Procedure. Refer to Throttle Learn .
CAUTION:
Refer to Fastener Caution
.