LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Porsche >> 1987 >> 944 L4-2479cc 2.5L >> Repair and Diagnosis >> Heating and Air Conditioning >> Service and Repair >> Using the Service Unit >> Fsv 102 Service Unit >> Filling the Service Unit
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Filling the Service Unit




Filling service Unit





1. Place refrigerant flask at some height, preferably place upside down (make frame). Open flask valve and allow fluid refrigerant to flow into the filling flask. The fill quantity must not exceed the maximum value (2200 g) on the lowest scale.

2. If the flask pressure is not adequate to fill the cylinder, the pressure building up can be released by opening valves 9 and 6 or 9 and 7.

3. If the cylinder is full, close the flask valve and valve 1. The unit is now ready for operation.

4. When refilling the cylinder, it is not necessary to evacuate again, if refrigerant is already flowing through the fill hose when screwing on to valve 1 (slightly open flask valve beforehand).