LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Porsche >> 1987 >> 944 L4-2479cc 2.5L >> Repair and Diagnosis >> Heating and Air Conditioning >> Service and Repair >> Using the Service Unit >> Fsv 102 Service Unit >> Initial Operation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Initial Operation




INITIAL OPERATION

1. Plug in electric cable (220 V, 50 Hz). Switches 15 and 16 switched off, all valves closed.

2. Screw flask-connection piece onto refrigerant flask. Connect refrigerant flask and flask connection valve 1 with fill hose. Flask valve closed, flask connection valve 1 opened.

3. Open the cap on bleed nipple 3 for a short period and close it again, in order to remove any excess pressure.

4. Open evacuating valve 3 and torrmeter cutoff valve 14. Switch on vacuum pump(switch 15). At an ambient temperature under + 100 C, before switching on unscrew quick-release connection so that pump can warm up without drawing vacuum. After 1 or 2 minutes, re-close quick-release connection.

5. Evacuate until the maximum final vacuum is reached (depending on prevailing air pressure). Set torrmeter index indicator this reading.

6. Open valves 2 and 9, and evacuate further until the maximum vacuum is once again reached.