LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Porsche >> 1997 >> Boxster (986) F6-2.5L >> Repair and Diagnosis >> Powertrain Management >> Computers and Control Systems >> Testing and Inspection >> Pinpoint Tests >> Test Point 28
October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.

Test Point 28





TEST POINT 28
Camshaft adjustment, bank 1 and bank 2

DTC 174, 178

1. measure voltage, Bank 1, cylinders 1 - 3

Connect voltmeter to control module connector or adapter pin 52 and pin 54

Ignition "ON"

Display: Battery positive voltage

2. measure voltage, Bank 2, cylinders 4 - 6

Connect voltmeter to control module connector or adapter pin 25 and pin 54

Ignition "ON"

Display: Battery positive voltage






3. Pull off valve connector and measure voltage between pin 1 (+) and ground (engine)

Ignition "ON"

Display: approx. 12 V

Note: Power is supplied via the DmE relay.