LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Porsche >> 1997 >> Boxster Automatic >> Repair and Diagnosis (Single Page) >> Accessories & Equipment >> Infotainment >> Radio >> Removing And Installing Display And Operator Control Unit (Pcm) >> Installing Display And Operator Control Unit (Pcm) >> Connecting And Switching On The PORSCHE System Tester 2
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Connecting And Switching On The PORSCHE System Tester 2

  1. Switch ignition on.
  2. Switch on PCM by pressing the volume control (display remains dark).
  3. Establish communication with the Porsche System Tester 2 and select PCM.
  4. Select Modify coding.
  5. Select PCM active.
  6. Confirm PCM active with the F8 key.