Main Relay
- Remove main relay from instrument panel relay block. See Figure or Figure . Measure resistance between main relay terminals No. 4 and No. 5. Resistance should be 80-90 ohms at 68°F (20°C). If resistance is not as specified, replace relay. Check for continuity between relay terminals No. 1 and 2. If continuity is not present, go to next step. If continuity is present, replace relay.
- Using jumper wires, apply battery voltage to terminal No. 4 and ground to terminal No. 5. See Figure. Check for continuity between relay terminals No. 1 and 2. If continuity is not present, replace relay. If continuity is present, inspect associated wiring for short or open circuits. See WIRING DIAGRAMS article. Repair wiring as necessary.