LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Saab >> 2011 >> 9-5 Turbo4, Standard >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 1 (Basic Engine, V6) >> Adjustment Replacement >> Secondary Timing Chain Guide Replacement - Left Side >> Installation Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation Procedure

WARNING: This page is about a different variant/trim than selected.
  1. Install the left bank secondary camshaft drive chain guide (1). Refer to SECONDARY TIMING CHAIN GUIDE INSTALLATION - LEFT SIDE .
    Fig 1: Identifying Left Bank Secondary Camshaft Drive Chain Guide And Mounting Bolt
    G09438405Courtesy of SAAB-SCANIA OF AMERICA, INC.
  2. Install the left bank secondary camshaft drive chain tensioner. Refer to SECONDARY TIMING CHAIN TENSIONER INSTALLATION - LEFT SIDE .
  3. Install the engine front cover. Refer to ENGINE FRONT COVER REPLACEMENT .