LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Saturn >> 2004 >> Vue Red Line, FWD >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery, Charging System And Starting System >> Repair Instructions >> Battery Replacement >> Installation Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation Procedure

    CAUTION: Do not tip the battery over a 45 degree angle or acid could spill causing serious personal injury.
    Fig 1: View Of Battery
    GM951451Courtesy of GENERAL MOTORS CORP.
    NOTE: Refer to Fastener Notice in Cautions and Notices.
  1. Install the battery and tighten the battery hold down bolt.

    Tighten:  Tighten the battery hold down bolt to 15 N.m (11 lb ft).

  2. Connect the positive battery cable to the battery.

    Tighten:  Tighten the battery terminal bolts to 17 N.m (13 lb ft).

  3. Connect the negative battery cable to the battery. Refer to Battery Negative Cable Disconnect/Connect Procedure .

    Tighten:  Tighten the battery terminal bolts to 17 N.m (13 lb ft).

  4. For vehicles with L61 engine, install the battery box. Refer to Battery Box Replacement .

    Tighten:  Tighten the battery cooling cover box screws to 2 N.m (18 lb in).

  5. Reprogram the radio stations.