LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Saturn >> 2007 >> Relay 3.9 1 >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery, Charging System And Starting System >> Description and Operation >> Charging System Description and Operation >> Charging System Operation >> Notes
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Charging System Operation: Notes

The purpose of the charging system is to maintain the battery charge and vehicle loads. There are 6 modes of operation and they include:

The engine control module (ECM) controls the generator through the generator field control circuit. It monitors the generator performance through the generator field duty cycle signal circuit. The signal is a pulse width modulated (PWM) signal of 128 Hz with a duty cycle of 0-100 percent. Normal duty cycle is between 5-95 percent. Between 0-5 percent and 95-100 percent are for diagnostic purposes. The following table shows the commanded duty cycle and output voltage of the generator:

Charging System Description and Operation

Commanded Duty Cycle Generator Output Voltage
10% 11 V
20% 11.56 V
30% 12.12 V
40% 12.68 V
50% 13.25 V
60% 13.81 V
70% 14.37 V
80% 14.94 V
90% 15.5 V

The generator provides a feedback signal of the generator voltage output through the generator field duty cycle signal circuit to the PCM/ECM, this information is sent to the body control module (BCM). The signal is a PWM signal of 128 Hz with a duty cycle of 0-100 percent. Normal duty cycle is between 5-99 percent. Between 0-5 percent and 100 percent are for diagnostic purposes.