Installation Procedure
- Install the ball stud to the rear axle tie rod.
Tighten: Tighten the height sensor ball stud to 12 N.m (106 lb in).
- Install the automatic level control sensor link to the tie rod ball stud.
- Lower the vehicle.
- Install the ELC/TRAILER fuse.