DTC P2008 Intake Manifold Runner Control Circuit / Open (Bank 1): Wiring Diagram
DIAGNOSIS PROCEDURE CHART
| Step | Check | Yes | No |
|---|---|---|---|
1 CHECK HARNESS BETWEEN ECM AND TUMBLE GENERATOR VALVE ACTUATOR CONNECTOR.
|
Is the resistance less than 1 Ω? | Go to step 2. | Repair the open circuit between ECM and tumble generator valve connector.
NOTE:
In this case, repair the following item:
|
| 2 CHECK POOR CONTACT. Check poor contact in tumble generator valve actuator connector. |
Is there poor contact in tumble generator valve actuator connector? | Repair the poor contact of tumble generator valve actuator connector. | Replace the tumble generator valve actuator. <Ref. to TUMBLE GENERATOR VALVE ACTUATOR . > |