DTC P2401: EVAP System Leak Detection Pump Control Circuit Low: Notes
DTC detecting condition:
Immediately at fault recognition
Wiring diagram:
Engine Electrical System Ref. to WIRING SYSTEM>Engine Electrical System>WIRING DIAGRAM .
- CHECK HARNESS BETWEEN ECM AND LEAK CHECK VALVE ASSEMBLY CONNECTOR
.
- Turn the ignition switch to ON.
- Measure the voltage between ECM connector and chassis ground.
Connector & terminal
(B137) No. 27 (+) - Chassis ground (-):
Is the voltage 10 V or more?
Yes: Go to 2
No: Go to 3
- CHECK FOR POOR CONTACT
.
Check for poor contact of ECM connector.
Is there poor contact of ECM connector?
Yes: Repair the poor contact of ECM connector.
No: Even if DTC is detected, the circuit has returned to a normal condition at this time. Reproduce the failure, and then perform the diagnosis again.
NOTE: In this case, temporary open or short circuit of harness or temporary poor contact of connector may be the cause. - CHECK POWER SUPPLY TO LEAK CHECK VALVE ASSEMBLY
.
Measure the voltage between the leak check valve assembly connector and engine ground.
Connector & terminal
(R400) No. 3 (+) - Engine ground (-):
Is the voltage 10 V or more?
Yes: Go to 4
No: Repair the power supply circuit.
- CHECK HARNESS BETWEEN ECM AND LEAK CHECK VALVE ASSEMBLY CONNECTOR
.
- Turn the ignition switch to OFF.
- Disconnect the connector from ECM.
- Disconnect the connector from the leak check valve assembly.
- Measure the resistance between leak check valve assembly and chassis ground.
Connector & terminal
(R400) No. 4 - Chassis ground:
Is the resistance 1 MΩ or more?
Yes: Go to 5
No: Repair the short circuit to ground in harness between ECM connector and leak check valve assembly connector.
- CHECK HARNESS BETWEEN ECM AND LEAK CHECK VALVE ASSEMBLY CONNECTOR
.
Measure the resistance of harness between ECM connector and the leak check valve assembly connector.
Connector & terminal
(B137) No. 27 - (R400) No. 4:
Is the resistance less than 1 Ω?
Yes: Go to 6
No: Repair the harness and connector.
NOTE: In this case, repair the following item:- Open circuit in harness between ECM connector and the leak check valve assembly connector
- Poor contact of coupling connector
- CHECK LEAK CHECK VALVE ASSEMBLY
.
Check the vacuum pump of the leak check valve assembly. Ref. to EMISSION CONTROL (AUX. EMISSION CONTROL DEVICES) (STI)>Leak Check Valve Assembly>INSPECTION>CHECK VACUUM PUMP .
Is the check result OK?
Yes: Repair the poor contact in the leak check valve assembly connector.
No: Replace the leak check valve assembly. Ref. to EMISSION CONTROL (AUX. EMISSION CONTROL DEVICES) (STI)>Leak Check Valve Assembly .