LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Subaru >> 2019 >> Ascent Base >> Repair and Diagnosis >> Engine Mechanical >> Auxiliary Emission Control Systems >> Emission Control Systems (Aux. Emission Control Devices) >> Purge Control Solenoid Valve >> Installation
September 30: LEMON manuals is back up on a temporary server! Slowness is possible

Purge Control Solenoid Valve: Installation

  1. Install the purge control solenoid valve bracket.

    Tightening torque: 

    6.4 N.m (0.7 kgf-m, 4.7 ft-lb)

    G13198475Courtesy of SUBARU OF AMERICA, INC.
  2. Connect the vacuum hose (A) and the vacuum hose (B), and install the purge control solenoid valve.

    Tightening torque: 

    3.4 N.m (0.3 kgf-m, 2.5 ft-lb)

    G13198474Courtesy of SUBARU OF AMERICA, INC.
  3. Connect the connector (A) and install the clip.
    G13198473Courtesy of SUBARU OF AMERICA, INC.
  4. Install the air intake duct. Ref. to INTAKE (INDUCTION) (H4DOTC)>AIR INTAKE DUCT>INSTALLATION .
  5. Connect the battery ground terminal. Ref. to REPAIR CONTENTS>NOTE>BATTERY .