October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Check Relay
- Check that there is no deformation, cracks or other damages.
- Check the resistance between terminals.
Courtesy of SUBARU OF AMERICA, INC.
|
| Terminal No. |
Inspection conditions |
Standard |
| 3 - 4 |
Apply battery voltage between terminals 1 and 2. |
Less than 1 Ω |
| 3 - 4 |
Always |
1 MΩ or more |