LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2009 >> Equator RMZ-4 >> Repair and Diagnosis (Single Page) >> Engine Performance >> System >> Engine Control System (VQ40DE) - (2 Of 5) >> DTC P0420, P0430: Three Way Catalyst Function >> Overall Function Check >> With GST
April 5, 2026: LEMON Manuals is launched! Read the announcement.

With GST

  1. Start engine and warm it up to the normal operating temperature.
  2. Turn ignition switch OFF and wait at least 10 seconds.
  3. Turn ignition switch ON.
  4. Turn ignition switch OFF and wait at least 10 seconds.
  5. Start engine and keep the engine speed between 3, 500 and 4, 000 RPM for at least 1 minute under no load.
  6. Let engine idle for 1 minute.
  7. Open engine hood.
  8. Set voltmeter probe between ECM terminals 74 [HO2S2 (bank 1) signal], 55 [HO2S2 (bank 2) signal] and ground.
    Fig 1: Setting Voltmeter Probe Between ECM Terminals 74 HO2S2 (Bank 1) 55 HO2S2 (Bank 2) Signal And Ground
    G06441434Courtesy of SUZUKI OF AMERICA CORP.
  9. Keep engine speed at 2, 500 RPM constant under no load.
  10. Check that the voltage does not vary for more than 5 seconds.

    If the voltage fluctuation cycle takes less than 5 seconds, go to [P0420, P0430 THREE WAY CATALYST FUNCTION ].

    • 1 cycle: 0.6 - 1.0 → 0 - 0.3 → 0.6 - 1.0