September 30: LEMON manuals is back up on a temporary server! Slowness is possible
Monitor Strategy
MONITOR STRATEGY
| Related DTC |
P0606: ECM range check |
| Required sensors/Components (main) |
ECM |
| Required sensors/Components (sub) |
Heated oxygen sensor |
| Frequency of Operation |
Continuous |
| Duration |
60 seconds |
| MIL Operation |
Immediate |
| Sequence of Operation |
None |