Connecting The Breakout Box And Checking The Ground Terminal: Notes
NOTE:
Before taking readings, the breakout box must be connected and the ground terminal must be checked. See CONNECTING THE BREAKOUT BOX TO THE ROAD TRAFFIC INFORMATION (RTI) CONTROL MODULE .