LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Acura >> 1994 >> Integra GS-R, 2D Coupe >> Repair and Diagnosis >> Electrical >> Charging Systems >> Alternator & Regulator >> On-Vehicle Testing >> Preliminary Inspection
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Preliminary Inspection

Check alternator wiring harness connections and drive belt tension. Ensure battery is fully charged. Ensure fuse No. 24 (15-amp or 20-amp on V-TEC engine) in dash fuse box is good.