86 10 ... Installation Position Of BMW Lettering
Top edge of lettering at same height as recess for position light (1).
Distance between drawbar member and lettering (2) is 300 mm.
Installation:
Remove grease from gluing surfaces.
Courtesy of BMW OF NORTH AMERICA, INC.