86 10 ... Removing Overrunning Equipment/Maintaining or Replacing Guide Bush/Installing Overrunning Equipment
After installing overrunning equipment, readjust brake system, refer to 86 10 ... ADJUSTING BRAKE SYSTEM
Check the guide bush while installed to ascertain whether it needs to be replaced. Raise ball end area and replace guide bush if play is detected in ball end area.
Release round head screws (1) and remove running board (2) towards top.
Installation:
Use new self-locking nuts.
Tightening Torque: 86 10 10AZ, see 86 10 PLATFORM .
Unhook tension spring (1) from tension spring mount (2).
Release screw (1) on pull rod (2) and remove hexagon nut. Slide brake compensator (3) towards rear.
Installation:
Use new self-locking nut.
Release screws (1) on jockey wheel mount and remove.
Release wiring harness mount (2) and remove. Reinstall screw and tighten until hand-tight.
Installation:
Tightening Torque for jockey wheel mount (1), 86 10 311AZ, see 86 10 PLATFORM .
Tightening Torque for wiring harness mount (2), 86 10 12AZ, see 86 10 PLATFORM .
Release screw on socket holder (1) and remove. Cut through strap (2) and lay wiring harness to one side. Pull gaiter (3) in direction of arrow.
Installation:
Use new self-locking nut.
Tightening Torque: 86 10 13AZ, see 86 10 PLATFORM .
Remove protective caps (1).
Release nuts (1) and remove.
Installation:
Use new self-locking nuts.
Tightening Torque: 86 10 14AZ, see 86 10 PLATFORM .
Tilt top reversing housing (1) in direction of arrow towards rear. Slide out top reversing housing (1) and bottom reversing housing with handbrake lever unit (2) in direction of arrow towards rear.
Remove holder (1) towards bottom.
Pull drawbar member (1) in direction of arrow and pull out overrunning equipment (2) in direction of arrow towards front.
Remove spacer tubes (1) and threaded pins (2) from guide bush (3).
Press pins (1) inwards. Detach counter support (2) and guide bush (3).
Maintenance:
Grease tow tube (4) and attach guide bush (3).
Installation:
Secure counter support (2) with new clamping sleeves to tow tube (4).
Insert spacer tubes (1) and threaded pins (2) in guide bush (3).
Make sure spacer tubes (1) are correctly seated in guide bush (3).
Using a screwdriver, link spacer tubes (1) and shock absorber located in tow tube. This ensures that the shock absorber remains in the correct installation position. Pull drawbar member (2) in direction of arrow and push in overrunning equipment (3) in direction of arrow towards rear.