Installation Procedure
- Connect the electrical connectors (1).
- Install the DIM into the bracket.
- Install the right sound insulator. Refer to CLOSEOUT/INSULATOR PANEL REPLACEMENT - RIGHT in Instrument Panel, Gages and Console.
- Reprogram the DIM. Refer to BODY CONTROL MODULE (BCM) PROGRAMMING/RPO CONFIGURATION (IPM) .