Installation Procedure
- Install the connectors to the PCM.
Tighten: Tighten the connectors to 8 N.m (71 in. lb.).
- Install the PCM into the air cleaner housing assembly.
- Install the air cleaner top cover.
- Connect the negative battery cable.
- The replacement PCM will NOT allow secondary air injection (AIR) pump operation until a total of 16.9 km (10 miles) have been accumulated.
- The new PCM must be programmed. Refer to Service Programming System (SPS) .
NOTE:
Refer to Fastener Notice
in Cautions and Notices.