Installation Procedure
- Install the battery.
- Install the battery hold down and bolt.
Tighten: Tighten the bolt to 17 N.m (13 lb ft).
- Install the battery vent tube to the battery.
- Position the positive battery cable (2) to the battery.
- Tighten the positive battery cable bolt (1).
Tighten: Tighten the bolt to 17 N.m (13 lb ft).
- Snap the positive battery cable cover (3) closed.
- Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection .
NOTE:
Refer to Fastener Notice
.
IMPORTANT:
Ensure that the vent tube is properly routed through the floor pan grommet.