LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Buick >> 2007 >> Lucerne CX >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery, Charging System And Starting System >> Repair Instructions >> Battery Replacement >> Installation Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation Procedure

    Fig 1: Removing/Installing Battery Hold Down
    GM1669926Courtesy of GENERAL MOTORS CORP.
  1. Install the battery.
  2. NOTE: Refer to Fastener Notice .
  3. Install the battery hold down and bolt.

    Tighten:  Tighten the bolt to 17 N.m (13 lb ft).

  4. Fig 2: Removing/Installing Battery Vent Tube
    GM1669924Courtesy of GENERAL MOTORS CORP.
    IMPORTANT: Ensure that the vent tube is properly routed through the floor pan grommet.
  5. Install the battery vent tube to the battery.
  6. Fig 3: Removing/Installing Positive Battery Cable Cover
    GM1669909Courtesy of GENERAL MOTORS CORP.
  7. Position the positive battery cable (2) to the battery.
  8. Tighten the positive battery cable bolt (1).

    Tighten:  Tighten the bolt to 17 N.m (13 lb ft).

  9. Snap the positive battery cable cover (3) closed.
  10. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection .