Installation Procedure
WARNING: This page is about a different variant/trim than selected.
- Install the from the battery energy control module (2) to the mounting studs and tighten the fasteners (1) to 9 N.m (80 lb in).
- Install the connectors (1) and connector (2).
- Connect the remaining connectors in the above graphic sequence.
- Enable the hybrid battery. Refer to High Voltage Enabling .
- Program the battery energy control module. Refer to Battery Energy Control Module Programming and Setup .
CAUTION:
Refer to Fastener Caution .