Installation Procedure
WARNING: This page is about a different variant/trim than selected.
- Install the generator control module cover (3).
- Install the generator control module cover fasteners (1) and tighten to 9 N.m (80 lb in).
- Install the generator control module cover fastener (2) and tighten to 9 N.m (80 lb in).
- Install thedrive motor battery cooling blower motor. Refer to Drive Motor Battery Cooling Blower Replacement .
- Install the generator control module cooling air outlet duct. Refer to Generator Control Module Cooling Air Outlet Duct Replacement .
- Install the high voltage 3-phase cable (2) to the generator control and battery module. Tighten the nuts (1) to 9 N.m (80 lb in).
- Install the 12V cable (3) to the generator control and battery module. Tighten the nut (4) to 9 N.m (80 lb in).
- Install the body harness connectors (1).
- Install the drive motor battery cooling air inlet lower duct.
- Install the drive motor generator battery bracket. Refer to Drive Motor Generator Battery Bracket Replacement .
- Install the intermediate duct retainers (1) to the generator control and battery module.
- Enable the hybrid battery. Refer to High Voltage Enabling .
NOTE:
Make sure the duct is flush against the seal for efficient generator control and battery module cooling.