Installation Procedure
- Check the crankshaft position.
- The mark (1) on the crankshaft must be set to about 80 degrees (a) after TDC (3).
- If not, turn the crankshaft in direction of engine rotation, use the crankshaft balancer absorber bolt (2).
- Ensure that the guide pin (2) is in line with the groove (1).
- Valve Lifter Follower (3) - Install
- Seal Ring (2) - Install a NEW seal.
- Fuel Injection Pump Gasket (1) - Install a NEW gasket.
- Fuel Injection Pump (3) - Install
- Install the 2 fuel injection pump bolts (4) alternating in steps of 1/2 turn.
- Fuel Injection Pump Bolt - Tighten 11 N.m (97 lb in)
- Install the fuel injection pump cover (2).
- Connect the electrical connector. (3) @ Fuel Injection Pump (1)
- Fuel Injection Fuel Feed Front Pipe Replacement - Install
- Clip (1) - Install
- Remove the EN-6015 plugs from all connections.
- Fuel Feed Front Pipe (2) @ Fuel Injection Pump (3) - Connect
- Front Wheelhouse Liner Replacement - Install
- Charge Air Cooler Outlet Air Hose @ Throttle Body - Install - Charge Air Cooler Outlet Air Hose Replacement
- Battery Negative Cable Disconnection and Connection - Connect
CAUTION:
Refer to Fastener Caution .